In our country the mindset of the people, even the scientific community needs to be changed.
In earlier days because of economically cheaper to concrete ,easy to built bituminous roads were popular in our country. But we now realise that though it is cheaper to make bituminous roads it is very costly to maintain them. The escalating cost of bitumen the bituminous road cost is increasing every year. It is observed that because of development of the admixtures it became possible to make concrete road which can open to traffic in three days. We have developed concrete technology for rural. city roads and highways
1)Rural roads
Thane unit of PMGSY (PRIME MINISTER GRAM SADAK YOGNA) laid in Murbad, Thane District first concrete road to connect Bhangarwadi 7KM away from main Bombay- Malcej highway
The technical details are as follows. The concrete is made using conventional equipments like 10/7 concrete mixer ,screed vibrator ,channel ,cutting machine etc.
The mix design is given below.
KG
Cement
|
250-300
|
Flyash
|
150-200
|
Crush sand
|
850
|
Metal 1
|
450
|
Metal 2
|
550
|
Admixture
|
3
|
water
|
140
|
The concrete cost is RS 4000/M3) The 150mm thick above concrete is laid over 150mm well compacted GSB layer. The last three years though the vehicular traffic is only bicycle, bikes. cars and bullock cards it is in good condition
The rural roads today the bituminous wearing course is worn out and the surface every were is of metalled one.It can be immediately surfaced by concrete roads.
2 City roads
Thane city is the excellent example of UTWT overlay.100-150mm thick concrete overlay over damaged bituminous roads .The city has laid 25km of roads in city
Thane municipal corporation has laid 25km of roads in city .They have ambitious plan of further 50km of UTWT roads in next two three yes
The mix design is given below
KG
Cement
|
380-400
|
Flyash
|
150
|
Crush sand
|
850
|
Metal1
|
450
|
Metal2
|
550
|
Admixture
|
4
|
Water
|
130-140
|
Economic
The cost of installing TWT overlay is compared with the Polymer modified bitumen mix( PMB) or crumb rubber bitumen (CRMB) mixes considering the five year bituminous mixes renewal period.
UTWT
|
PMB / CRMB
|
Concrete
| |
Rate, Rs. Per square meter
|
2200
|
1575
|
6000
|
Yearly repair cost
|
nil
|
100
|
0
|
Nil
|
100
|
0
| |
Nil
|
100
|
0
| |
Nil
|
100
|
0
| |
Renewal layer
|
nil
|
1575
|
0
|
Total after five years
|
2200
|
3550
|
6000
|
3)High ways
Reinforced UTWT of 200mm thickness is used. The reinforcement is of steel mesh of 6mm diameter fixed at the bottom of the road.
The mix design is given below
KG
cement
|
400-420
|
flyash
|
150
|
Crush stone
|
850
|
Metal1
|
450
|
Metal 2
|
550
|
admixture
|
4
|
water
|
130
|
The crore of rupees spent on maintenance of the bituminous roads can be saved by concrete roads.